Premium Ready-Mix Concrete
Simplify your construction needs with high-quality ready-mix concrete in Tomball, TX. With Tomball Rental Center’s convenient U-Cart concrete service, concrete is available six days a week. Our high-tech concrete blending system is capable of producing up to 10 yards of ready-mix concrete per hour.
Using your full-size tow vehicle, take one of our tandem-axle carts and, from ¼ to 1¼ yard up to about 20 miles, back up to your form. Then, using the built-in hydraulic jack, you can place the concrete right where you need it. No more back-breaking bags of sack concrete!
Most people don’t realize that mixing just one yard of concrete by hand in a wheelbarrow or a small mixer requires over 40 bags of sack concrete! Folks, life is too short for that kind of labor when you can have the finished product for less money than the cost of the sack of concrete.

Note: The final strength of this product is dependent on several factors, including cement content, type of reinforcement used (wire mesh or rebar), quality of site preparation (soil compaction, wetness, etc.), and skill in placing and finishing the concrete. In some cases, this product is simply not suitable due to the fact that a large aggregate (rock) is not used in mixing.
Because of the many variables that come into play, some of them outside our control, Tomball Rental Center cannot guarantee the suitability of this product to a particular task and will not be liable for consequential damages or lost labor or materials.
| Quantity | Approximate Volume | Approximate Coverage at 4″ Thickness | Price Excluding Tax and Deposit |
|---|---|---|---|
| 1 ¼ Yard (Max per Trip) | 33 Cubic Feet | 100 Square Feet | $224.00 |
| 1 yard | 27 Cubic Feet | 80 Square Feet | $175.00 |
| ¾ yard | 20 Cubic Feet | 60 Square Feet | $xxx.00 |
| ½ yard | 13 Cubic Feet | 40 Square Feet | $xx.00 |
| ¼ yard | 6 ½ Cubic Feet | 20 Square Feet | $xx.00 |
After the first full yard or more taken (must be on the same day), partial yard prices are:
| ¾ Yard | $xxx.00 |
| ½ Yard | $xx.00 |
| ¼ Yard | $xx.00 |
| Extra Bag Cement | $xx.00 |
| Pickup Load Sand/Gravel | $xx.00 |
